HSP-007 Execution: MPC Node Infrastructure Financing Program

Thank you so much for this very detailed performance report, @AK_HoG ; I can tell that there was a lot of work put into complying it. I noticed that HOT was not included in the March performance results, eventhough they were one of the nine current MPC node operators . Did they not meet the minimum of 95.0% uptime to be eligible to receive the March payout?